Winterthur main station, Monitoring construction of pedestrian underpass
Automatic excavation pit, track and building monitoring with geodetic and geotechnical sensors
A new pedestrian underpass with a bicycle tunnel is being built at Winterthur railway station. This construction project is intended to cover the 4th largest station in Switzerland in response to the increasing flow of commuters and the additional demand for shopping facilities and bicycle parking spaces in the immediate vicinity of the station. The multi-year construction project will be carried out under full operation of the station.
Since the pedestrian underpass and the bicycle tunnel will be built under highly frequented tracks, they will be permanently monitored by our monitoring system. Additionally endangered structures such as the temporarily erected pedestrian passages, the parking deck support and the surrounding buildings, some of which are listed buildings, are also monitored for 3D deformations, impermissible vibrations and high-pressure presses at 20-minute intervals to detect any pressure fluctuations.
The test engineers, site managers and foremen are immediately alerted via SMS and e-mail if a limit value is exceeded. This timely and detailed information via a web portal allows them to quickly take appropriate countermeasures in the event of critical events.
Our services
- Installation of a complex geodetic and geotechnical measuring system
- System operation during the entire construction phase (approx. 4 years)
- Automatic measurements at 20-minute intervals
- Automatic alarming when limit values are exceeded
- Weekly manual 3D deformation measurements

Monitoring the construction of S21 at Berlin main station

Monitoring mountain railways Zermatt

Winterthur main station, Monitoring construction of pedestrian underpass

Monitoring new building Inselspital BB12, Bern

Monitoring Rebuilding Hotel Palace, Luzern

Monitoring at new Gubrist tunnel

Reconstruction of rail track intersection Wylerfeld, Berne

NaGNet GPS-Monitoring

Railway track and excavation pit monitoring Murtenstrasse Bern

GNSS Monitoring Ropeway Moosfluh

AlpTransit Gotthard Dam Safety Monitoring

Hospital „Kantonsspital Graubünden“, SUN extension project

Railway track monitoring Dortmund main station

Tunnel monitoring „Galleria Dragonato“
Learn more
All references
Monitoring the construction of S21 at Berlin main station

Monitoring mountain railways Zermatt

Monitoring new building Inselspital BB12, Bern

Monitoring Rebuilding Hotel Palace, Luzern

Monitoring at new Gubrist tunnel
