Monitoring Rebuilding Hotel Palace, Luzern

Automatic height monitoring with liquid levelling and total stations

Back

The Hotel Palace Lucerne is a hotel of the Belle Époque and was built between 1904 and 1906. Since the end of 2018, the hotel has been completely renovated for CHF 100 million over a period of approximately one year.

As part of this renovation work, load changes will occur through lowering work in the basement on the one hand and through the complete gutting and conversion of the 5th and 6th floors on the other. As the historic building already showed minor cracks before the statically far-reaching conversion work, these load changes had to be permanently monitored with an automated height monitoring system.

The civil engineers had put out to tender an automated liquid levelling system on 65 statically relevant supports. The on-site inspection revealed that a liquid levelling system inside the building would obstruct the construction work too much or that the risk of damage to the measuring system caused by work with roller scaffolds was too great.

Together with the civil engineers, it was decided to install a combined measuring system consisting of several liquid levelling systems and a precision total station inside the building. The measuring system has been in operation since December 2018 and provides reliable and high-precision changes in height of the building in the sub-millimeter range!

Our services

  • Installation of a combined height monitoring system consisting of 4 liquid levelling systems and a precision total station.
  • Operation of the system during the one-year rebuilding phase.
  • Automatic measurements at hourly intervals
  • Automatic alarming when limit values are exceeded

SwiMo - Berlin Hauptbahnhof

Monitoring the construction of S21 at Berlin main station

Berlin, Germany
Deutsche Bahn AG
2015 - 2026
Learn more
SwiMo - Zermatt Bergbahnen

Monitoring mountain railways Zermatt

Zermatt, Switzerland
Zermatt Bergbahnen AG
2018 - ...
Learn more
SwiMo - Bhf Wthur Personenunterführung

Winterthur main station, Monitoring construction of pedestrian underpass

Winterthur, Switzerland
STRABAG AG, Schlieren
2018 - 2022
Learn more
SwiMo - Inselspital BB12

Monitoring new building Inselspital BB12, Bern

Bern, Switzerland
Inselspital, Infrastructure Directorate
2017 - 2020
Learn more
SwiMo - Hotel Palace Luzern

Monitoring Rebuilding Hotel Palace, Luzern

Luzern, Switzerland
Civil Engineer: Itten + Brechbühl, Zürich
2018 - 2020
Learn more
SwiMo - Gubrist 3. Röhre

Monitoring at new Gubrist tunnel

Zürich, Switzerland
Federal Roads Office (FEDRO)
2016 - 2022
Learn more
SwiMo - Bern Wylerfeld

Reconstruction of rail track intersection Wylerfeld, Berne

Berne, Switzerland
Swiss Federal Railway
2015 - 2021
Learn more
SwiMo - NAGRA GPS-Monitoring

NaGNet GPS-Monitoring

North of Switzerland & South-Germany
NAGRA, Switzerland
2010 - 2024
Learn more
SwiMo - Bern Murtenstrasse

Railway track and excavation pit monitoring Murtenstrasse Bern

Bern, Switzerland
Gross Generalunternehmung AG
2016 - 2019
Learn more
SwiMo - GNSS Moosfluh

GNSS Monitoring Ropeway Moosfluh

Riederalp, Switzerland
Aletsch Bahnen/PLANAX AG
2015 - ...
Learn more
SwiMo - AlpTransit Staumauermonitoring

AlpTransit Gotthard Dam Safety Monitoring

Gotthard region, Switzerland
AlpTransit Gotthard AG & Axpo AG
2000 - ...
Learn more
SwiMo - Chur Kantonsspital

Hospital „Kantonsspital Graubünden“, SUN extension project

Chur, Switzerland
Kantonsspital Graubünden
2014 - 2017
Learn more
SwiMo - Dortmund Hauptbahnhof

Railway track monitoring Dortmund main station

Dortmund, Germany
Civil engineering department of Dortmund
2014 - 2017
Learn more
SwiMo - Bellinzona Dragonato

Tunnel monitoring „Galleria Dragonato“

Bellinzona, Switzerland
Swiss Federal Railways
2017 - 2019
Learn more
SwiMo - Stalvedro

Rock face monitoring

Stalvedro, Switzerland
Federal Roads Office FEDRO
2015 - 2018
Learn more

Learn more

All references
SwiMo - Berlin Hauptbahnhof

Monitoring the construction of S21 at Berlin main station

Berlin, Germany
Deutsche Bahn AG
2015 - 2026
Learn more
SwiMo - Zermatt Bergbahnen

Monitoring mountain railways Zermatt

Zermatt, Switzerland
Zermatt Bergbahnen AG
2018 - ...
Learn more
SwiMo - Bhf Wthur Personenunterführung

Winterthur main station, Monitoring construction of pedestrian underpass

Winterthur, Switzerland
STRABAG AG, Schlieren
2018 - 2022
Learn more
SwiMo - Inselspital BB12

Monitoring new building Inselspital BB12, Bern

Bern, Switzerland
Inselspital, Infrastructure Directorate
2017 - 2020
Learn more
SwiMo - Gubrist 3. Röhre

Monitoring at new Gubrist tunnel

Zürich, Switzerland
Federal Roads Office (FEDRO)
2016 - 2022
Learn more
SwiMo - Bern Wylerfeld

Reconstruction of rail track intersection Wylerfeld, Berne

Berne, Switzerland
Swiss Federal Railway
2015 - 2021
Learn more